- The EDC System is incorporated into the roof deck area.
The 3CC System is incorporated into the swimming pool
The 3CC & Caltite System was incorporated at slab on grade
The 3CC System is incorporated into the cistern tank.
The Integral waterproofing System is incorporated into roofdeck and machine room.
- The 3CC System is incorporated into the rehabilitation of the existing fender system.
- The 3CC System will be used in the STP waterproofing.
The 3CC System is incorporated into the podium.
- The 3CC System was incorporated into the base slab and walls waterproofing.
- The 3CC System is incorporated into the in ground swimming pool.
- The 3CC System was incorporated into the basement retaining wall (7 level), ramps, and cistern tank waterproofing.
- The 3CC System is incorporated into the on-ground swimming pool.
The 3CC System is incorporated into the rehabilitation of the cistern tank.